UPSIZE WITHOUT DIGGING!

The illustration above represents an actual Municipal City Park job completed by Express Plumbing. Here we UPSIZED A 365 FOOT, 4 INCH CAST IRON SEWER PIPE LINE TO A 6 INCH POLY PIPE! The new 6 inch poly pip was pulled through the existing 4 inch cast iron sewer line that was running through the park. The replacement line was installed by Express Plumbing in order to drain a new sewage ejection pump connected through a manhole 365 feet across the park. The park was full of oak trees and obstructions; digging was not allowed.

This job was completed in less than three days; the pipe bursting pull took less than a single day!